Our work

Completed jobs, with the numbers attached.

Eight recent projects across fabrication, fitting and welding — what was built, in what material, over how long. Site references and contacts available on request.

  • 240Completed projects
  • 3,800 tSteel fabricated
  • 98%On-time delivery
  • NilLost-time injuries

Recent projects.

Listed newest first. Every job below was surveyed, drawn, fabricated and installed by our own crew — nothing here was sub-contracted out and badged as ours.

Erection crew working at height on scaffolding above a concrete slab.

MT-2601

Warehouse frame erection

Portal frame off-loaded, set out and erected over a live yard, working around delivery traffic. Columns plumbed and grouted, rafters bolted up and torqued, purlins and bracing run before the sheeting crew followed us on.

Client
Logistics operator
Location
Warri, Delta
Material
Mild steel sections
Scope
42 t erected
Duration
9 weeks
Completed
2026
Welder running a root pass on a steel pipe joint at ground level.

MT-2548

Process pipe rack and spools

Rack steel fabricated in the shop, spools pre-fabricated to isometrics and welded out on site. Root passes run in TIG, fill and cap in stick. Third-party radiography on the specified joints, reports handed over with the as-builts.

Client
Chemical plant
Location
Port Harcourt, Rivers
Material
Sch. 40 carbon steel
Scope
610 m, 1,240 welds
Duration
14 weeks
Completed
2026
Site crew in high-visibility gear working together on the ground at a site.

MT-2537

Conveyor gantry installation

A 12 m gantry lifted in during a fixed 96-hour window. Set-out and drive alignment done before the crane was released; belt tracked and guards fitted inside the window with the plant back in production on schedule.

Client
Aggregate producer
Location
Delta State
Material
Mild steel, galvanised walkway
Scope
12 m span, drive align
Duration
96 hrs
Completed
2025
Cutting head working across steel plate with sparks streaming off the bed.

MT-2521

Hopper and chute plate work

Eighteen hoppers and transfer chutes cut, rolled and welded in 6 mm stainless, with wear liners bolted rather than welded so the plant can change them without a welder on site.

Client
Food processing plant
Location
Port Harcourt, Rivers
Material
6 mm 304 stainless
Scope
18 units
Duration
7 weeks
Completed
2025
Tradesman working a steel component at a bench in a fabrication shop.

MT-2509

Access platforms and stairs

Platforms, stair flights and handrail fabricated to a marked-up survey after the issued drawings were found three revisions out of date. Re-measured, re-drawn, signed off and installed without a return visit.

Client
Commercial developer
Location
Port Harcourt, Rivers
Material
Channel, grating, galvanised
Scope
180 m handrail
Duration
6 weeks
Completed
2025
Angle grinder dressing a weld in a dark workshop, dense shower of sparks.

MT-2494

Plant shutdown fitting

Four crews on shift against a 96-hour shutdown: chutes and liners replaced, two gearboxes changed out, guards refitted and a full dimensional check before start-up. Nil re-work called after handover.

Client
Manufacturer
Location
Warri, Delta
Material
Mild steel, wear plate
Scope
4 crews, 2 gearboxes
Duration
96 hrs
Completed
2025
Steel roof structure seen from below against an open sky.

MT-2478

Structural steel mezzanine

A 320 m² storage mezzanine fabricated and erected inside an operating warehouse. Columns set out around existing racking, steel lifted in sections small enough to pass through the roller door, welded out in place.

Client
Industrial distributor
Location
Warri, Delta
Material
Mild steel, chequer plate
Scope
320 m², 28 t
Duration
8 weeks
Completed
2024
Storage tanks and process pipework at an industrial plant under a bright sky.

MT-2455

Tank farm walkway and pipe supports

Walkway, handrail and pipe supports built to a hot-work permit regime with a standing fire watch. Fabrication done off site to keep hot work inside the tank farm to the minimum, with bolted connections wherever the design allowed.

Client
Tank farm operator
Location
Niger Delta
Material
Galvanised steel
Scope
240 m walkway
Duration
11 weeks
Completed
2024

Site references and client contacts available on request — ask when you send a drawing.

Three sectors, one standard.

Storage tanks and pipework at a process plant.

Sector 01

Oil, gas & tank farms

Pipe spools and supports, walkways, access platforms and structural repairs — worked to permit systems, with hot work planned off site wherever the design allows it.

Interior of a clear-span steel warehouse building.

Sector 02

Manufacturing & processing

Shutdown fitting, conveyor and chute work, hoppers, guards and machine bases. Scopes written against a fixed window and crews staffed to hit it.

Worker in high-visibility gear on a reinforced concrete construction site.

Sector 03

Commercial & residential

Mezzanines, staircases, balustrades, gates, canopies and structural steel for buildings — fabricated to a survey, finished to be seen.

What gets said afterwards.

“They took a set of drawings that were three revisions out of date, re-measured on site, and came back the same week with a mark-up and a firm price. The steel fitted first time and the shutdown finished six hours early.”

T. OkonkwoMaintenance ManagerProcess plant, Port Harcourt

Send the drawing. We will price it inside 48 hours.

Or send measurements and what the job has to carry — we will do the take-off ourselves.

Get a quote 0806 219 0192